Adjust the project size and the assumptions below to see how a digital backbone can change the labour, copper and margin on a job.
Combined standard hardware, lighting switches and heating stats budget.
Share of cable-pulling and copper cost saved by running a simple bus loop instead of individual switch drops.
Installation time saved through centralised consumer-unit wiring and fewer intricate joints.
Chargeable premium for configuration extras (All-Off buttons, scenes, heating links) that need no extra hardware or copper.
Heavy copper layout, long cable runs, fixed configuration.
Less copper to pull, less first-fix time, plus configuration upsell.